GRP Sport Center, Cibitung

Once upon a time at mid 2022, we got a phone call from vinyl sport supplier. They wanted to install their sport vinyl on the jobsites. But they had problem about the flatness.

After we discussed about method, timeline and price. They asked us to visit to the jobsite for a joint survey. After we did, they floor level have a major problem. They already installed ceramic and we used it as our 00 level. And we found that the level around 10 to 15 mm.

The owner asked us to make a mock up for 1 badminton field. And they happy with the result. After that, we continued working in there. Finally we flatten 9 sport field.

  • 6 badminton fields 1 volleyball field
  • 1 basketball field
  • 1 futsal field

According to our records, we sent

  • 28 pails of Mapei Primer G
  • 2051 bagz of Mapei Ultraplan Contract

The project is around 2.400 sqm, and we completed it in November 2022. We need 6 weeks to complete it.